With both of the console tubes in place and welded together, I can try and place the MR2 shifter mechanism. I cut it down to minimize it. I then sat in the car and tested the comfort and then tacked it in place.
Tag Archives: MR2 suspension
Building the VW center console #321
I now have a new slide show on the new “MR2 VW Bug pics page 6” page
I now have a new slide show on the new “MR2 VW Bug pics page 6” page. MR2 VW bug pics page 6
Work on center console locate shifter #320
Work on the center console continues. I am trying to determine where the MR2 shifter and parking brake handle will be located as well as how to build the console itself. My plan is to use 2 3×3 inch steel tubes with the top tube longer than the bottom one. The top tube will be longer so that I will have a little play on where to mount the shifter.
Work on vw shifter and E-brake handle #319
Plan out shift cables through VW rear fire-wall #318
With the radiaor mounts finished, I am now working on the VW bug shifter. The shifter will need to penetrate the rear fire wall to enter the passenger cabin. I am using a cardboard cutout to determine where the hole should be. I first made the template to fit in the firewall and then moved it to the rear motormount to find the hole location. I can then move it back to cut out the hole.
Finish condenser brackets, more planning #317
Mount condenser to VW bug radiator #316
Finish the upper VW bug radiator mount brackets #315
Now that I have determined where and how to mount the top of the radiator/condenser assembly, I have constructed 2 brackets to hold it all in place. I bent the 2 brackets and then clamped them in place and drilled them out. after I mounted them I marked the excess and then removed them to clean them up. I will still need to make the brackets to hold the condenser to the radiator.