Work on the center console continues. I am trying to determine where the MR2 shifter and parking brake handle will be located as well as how to build the console itself. My plan is to use 2 3×3 inch steel tubes with the top tube longer than the bottom one. The top tube will be longer so that I will have a little play on where to mount the shifter.
A VW TURBO BUILD… SO RAD!
I am excited to see the final results!
I wish I could put something awesome together like that!