Work on the center console continues. I am trying to determine where the MR2 shifter and parking brake handle will be located as well as how to build the console itself. My plan is to use 2 3×3 inch steel tubes with the top tube longer than the bottom one. The top tube will be longer so that I will have a little play on where to mount the shifter.
Tag Archives: clutch pedal
Work on vw shifter and E-brake handle #319
Plan out shift cables through VW rear fire-wall #318
With the radiaor mounts finished, I am now working on the VW bug shifter. The shifter will need to penetrate the rear fire wall to enter the passenger cabin. I am using a cardboard cutout to determine where the hole should be. I first made the template to fit in the firewall and then moved it to the rear motormount to find the hole location. I can then move it back to cut out the hole.
Finish condenser brackets, more planning #317
Mount condenser to VW bug radiator #316
Finish the upper VW bug radiator mount brackets #315
Now that I have determined where and how to mount the top of the radiator/condenser assembly, I have constructed 2 brackets to hold it all in place. I bent the 2 brackets and then clamped them in place and drilled them out. after I mounted them I marked the excess and then removed them to clean them up. I will still need to make the brackets to hold the condenser to the radiator.
Start to create the VW bug upper radiator mounts #314
Finish mounting the VW bug radiator & AC condenser # 313
Finish steel work below the VW bug radiator #312
Mount the VW bug radiator to the frame work #311
I can now mount the radiator into the front nose of the VW bug. I left a small amount of the original sheet-metal in place along the lower edge of the front compartment. I am using this small strip to mount the bottom of the radiator to the chassis. 6 10-24 screws will hold it in place. So far all of the clearances look good.