Now that the frame has been flipped up-side-down again, I will try and get both the front sway bar mounts and the e-brake locations figured out. The sway bar mounts will be bolted to the frame with 3/8″ grade-8 hardware. I will be doing alot of thinking before I can claim that the underside of the frame is complete.