After cutting and tack welding my VW bug front strut link, I determied where the MR2 strut bolt holes will be and drilled them out. I went ahead and tacked the strut compression tops to the crosslink to try and figure out the exact location of the link. I will be using the foam board template to get the shape and size of the frame connector tubing.