Start to create the VW bug strut link channel #205

The newly created VW bug front strut link will need to be able to be removed and reinstalled so that the body can be fit and refit. I am creating a channel that will be connected directly to the framing steel that will be able to be bolted to the front strut link. This channel will be made from 1-3/4″x1-3/4″ steel tubing. The front strut link should fit nicely inside this channel.

Bookmark and Share

Tack weld the VW bug front strut link #203

With everything lined up on the VW bug front strut link, I can weld everything together. I will be putting a minimum of tacks in place because I don’t want to heat the metal too much and fry the bearings. I have an additional grounding strap on the assembly to make sure both pieces of steel have a good ground for weld penetration. I will finish the welding with the bearings removed.

Bookmark and Share

Cut the VW bug front strut link from square tubing #201

I can now cut out the front VW bug strut link with my cut-off wheel. The video stops for some reason during the first cut, but I finally get it all cut out. I have to expand the tubing a bit on the ends so that the MR2 spherical strut mounts will fit. But a little bit more grinding and drilling and it should fit fine.

Bookmark and Share

Start to create the VW bug’s front strut link #200

With my MR2 front strut link template created, I can trace the profile to the steel tubing. The template is made from 1/4″ foam board and the link itself is 1.5″x1.5″ steel tubing. I will now cut the steel tubing a bit longer and slowly grind it down to fit.

Bookmark and Share