VW Bug – Toyota MR2 Fit rear basket over the 3SGTE motor #39

I am placing the basket material (constructed earlier) over the Toyota MR2 3SGTE motor. This gives me a good idea where everything will sit under the VW Bug body. I need this info to start the initial frame planning.

Bookmark and Share

VW Bug – MR2 Final 3SGTE block up with mounts & accessories #38

The initial frame plan can start, now that I have the VW Bug’s drive train in place. As you can see I have finished the alignment of the Toyota MR2 3SGTE motor. I have both struts in place as well as the motor mounts and all the accessories (starter and AC unit etc.). Oh and the shop crane has been removed.

Bookmark and Share

VW Bug – Toyota MR2 3SGTE rear cross-member and suspension #37

I now have the MR2 3SGTE rear cross-member installed as well as tying in all the suspension components. The two lower control arms and the two rear control linkages attach to the cross-member. This is a tight fit under the VW Bug body.

Bookmark and Share

VW Bug – Toyota MR2 drivetrain alignment and support #36

In this video you have to look for the changes. The engine is tilted back at the correct angle for the Toyota MR2 3SGTE engine. I also have blocks supporting the engine from below (no weight on the chains of the shop crane). I still need to install the rear cross-member to get everything exactly where it needs to be in the VW Bug rear end.

Bookmark and Share

VW Bug – Toyota MR2 3SGTE drivetrain assembly continues #35

The VW Bug rear end assembly continues with the addition of the Toyota MR2 3SGTE driver side rear drive axle and wheel. Some initial alignment has also been completed.

Bookmark and Share

VW Bug rear end mockup continues-Install MR2 pass rear wheel-set in box #34

After installing the MR2 passenger drive axle, I can now bolt the wheel on. The wheel will sit in the wooden box for the VW bug rear end alignment.

Bookmark and Share

VW Bug Initial rear end mockup-install the MR2 transmission and pass rear axle #33

After installing the MR2 transmission, I am now able to start the rear end assembly. As you can see I have installed the passenger side rear drive axle.

Bookmark and Share

Install the Toyota MR2 Clutch Masters Clutch #32

I am installing the Toyota MR2 Clutch Masters stage 1 HD clutch. It should be good for mild 350-400 HP driving.

Bookmark and Share

Finish torque down on Toyota MR2 flywheel #31

The Toyota MR2 flywheel and crankshaft needed to be secured (keep from spinning) in order to torque down the crank bolts. I used a small piece of wood backed up with a bolt turned sideways against the tranny locating pin in the block.

Bookmark and Share

Install the MR2 3SGTE flywheel to the stroker motor #30

I can now install the Toyota MR2 3SGTE flywheel. It had to be machined twice, once for the bolt holes and once for resurfacing.

Bookmark and Share