I am placing the basket material (constructed earlier) over the Toyota MR2 3SGTE motor. This gives me a good idea where everything will sit under the VW Bug body. I need this info to start the initial frame planning.
The initial frame plan can start, now that I have the VW Bug’s drive train in place. As you can see I have finished the alignment of the Toyota MR2 3SGTE motor. I have both struts in place as well as the motor mounts and all the accessories (starter and AC unit etc.). Oh and the shop crane has been removed.
In this video you have to look for the changes. The engine is tilted back at the correct angle for the Toyota MR2 3SGTE engine. I also have blocks supporting the engine from below (no weight on the chains of the shop crane). I still need to install the rear cross-member to get everything exactly where it needs to be in the VW Bug rear end.