Roll frame out of the garage for the 1st time. #380

I am finally finished with everything that I need to do to the frame before putting the body back on for good. I will need to roll the frame out of the garage and bring the VW bug body back in. Once I finish the repairs and painting on the body I will unite both body and frame for good.

Bookmark and Share

Build the fuel pump bracket #378

With the fuel system in place, I need to create the bracket that will hold the fuel pump firmly. I cut the top out of a piece of 3×3 14 gauge square tubing. I then bent the ends up to fit in the fuel box, marked everything and screwed it in place. The bolts holding the fuel pump to the bracket have been welded to the bracket so I don’t have to try and get a wrench under the bracket.

Bookmark and Share

Finish installing the stainless fuel lines #377

With all of the braided stainless fuel lines complete, I can now finish the mock up of the fuel system. I will be removing all the lines and devices later to complete the fuel system before starting the engine. All lines will be flushed and cleaned to insure that there is no foreign debris in the system.

Bookmark and Share

Cut stainless braided fuel lines #375

I can now cut and fit the braided stainless fuel lines. I transferred the mock up tubing measurements to the fuel line and cut them to fit. I am using a tubing cutter to get a good straight line on the braided line. The tubing cutter also compresses the steel braid filaments at the point of the cut and helps keep it from fraying. The Dremel tool also gives a good fray free cut to get the hose end on correctly.

Bookmark and Share

Finish mocking up the fuel system #374

I now have the fuel system completely plumbed up with the plastic mock up tubing. The stainless braided fuel line is expensive so I want to cut and fit the stuff only once. Hopefully everything fits the first time.

Bookmark and Share

Continue mocking up fuel system #373

Now that I know where the fuel lines need to penetrate the rear firewall, I went ahead and drilled out the opening. With the fuel injection there is a supply line and a return line to the tank. I will plumb up the system with some cheap plastic tubing and then cut the braided stainless lines to match. This way I can do my best to not waste the expensive stainless line.

Bookmark and Share