Start to create the VW bug strut link channel #205

The newly created VW bug front strut link will need to be able to be removed and reinstalled so that the body can be fit and refit. I am creating a channel that will be connected directly to the framing steel that will be able to be bolted to the front strut link. This channel will be made from 1-3/4″x1-3/4″ steel tubing. The front strut link should fit nicely inside this channel.

Bookmark and Share