Plan out the VW bug’s front suspension bracing #214

With the VW bug’s front strut link and lower support tack welded in place, I must further support the assembly with additional bracing for triangulation. I believe I will use some 1×1 inch steel tubing and connect the front nose of the frame with the top outside portions of the strut link member.

Bookmark and Share

Finish tacking on the VW bug’s front strut supports #213

After spending some time lining everything up perfectly, I finally tack welded the VW bug’s front end suspension members together. This alignment was critical to insure that the front suspension track and ride correctly. I am happy with the results so far all I have to do is add some triangulation bracing to strengthen the assembly.

Bookmark and Share

Create template to determine the VW front strut supports #209

With my new foam board template created, It appears that everything will line up correctly. I drew a center line down the center of the foam board and used half of each measurement to get everything exactly symmetrical. I can use the outside pieces of the template to cut out the steel tubing.

Bookmark and Share

Start to create the VW bug strut link channel #205

The newly created VW bug front strut link will need to be able to be removed and reinstalled so that the body can be fit and refit. I am creating a channel that will be connected directly to the framing steel that will be able to be bolted to the front strut link. This channel will be made from 1-3/4″x1-3/4″ steel tubing. The front strut link should fit nicely inside this channel.

Bookmark and Share