I now have the paneling brackets in place. These brackets will hold down all the internal panels and engine covers and such. I will drill and tap these later when the panels go in.
Now that I have the small 90 degree angle brackets cut out, I can start to attach them to the main frame rails. These brackets will be used to attach the floor boards later when all the plumbing is finished.

Archives

Full Archive

Featured Links

Tag Cloud